top of page
Search

Traffic Alert – Wrightsville Beach Bridge Replacement Project, July 20

From the North Carolina Department of Transportation, July 20 @ 10:36am:


Overnight lane closures on the Causeway Drive (U.S. 76) bridge over Banks Channel will pause this week and resume Monday, July 27. Contract crews are performing drilling operations through the bridge deck for testing. 


Crews will close both eastbound lanes of Causeway Drive nightly from 7 p.m. to 6 a.m., Monday through Friday. Drilling operations are expected to be complete by July 31, weather permitting.


--


From the Chamber:


The Wrightsville Beach Bridge Replacements project, which will encompass many smaller projects and milestones, is an NCDOT project, not Town of Wrightsville Beach project. NCDOT is the outlet for all official communication. You can sign up to receive communication alerts via email and/or text message on the NCDOT Wrightsville Beach Replacements page at https://www.ncdot.gov/projects/wrightsville-beach-bridge-replacements/Pages/default.aspx

 
 
 

Comments


  • Facebook
  • Instagram

© 2025 by Wrightsville Beach Chamber of Commerce
Site by Envision Communications

bottom of page